News

  • Home
  • info
  • The first safety accident emergency drill of Liaoning Liquid Sunshine New Energy Co.

The first safety accident emergency drill of Liaoning Liquid Sunshine New Energy Co.

In order to deeply implement the safety production policy of “safety first, prevention first, comprehensive treatment”, and enhance the emergency response capability of all staff, on the morning of December 25th, the company organized the first emergency response drill for safety accidents, simulating the scene of dripping from the discharge port of the V703 tank, to comprehensively test the scientific nature of the emergency response plan and the team's ability to fight the battle.

Practical exercise: every second counts

At 9:30 a.m., the drill commander-in-chief, company leader Geng Quanwu gave an order, the alarm sounded, the emergency drill officially opened.

 

Dangerous situation: inspectors found the ground leakage of V703 tank outlet and immediately reported it through walkie-talkie. Dangerous situation is an order, the company's safety and environmental protection department immediately started the "Emergency Response Plan for Leakage of Dangerous Chemicals", and the emergency response team responded swiftly.

Rapid assembly: at 9:35 a.m., the alert and defense group arrived first, and implemented traffic control and personnel evacuation within 50 meters of the leakage area; the rescue and relief group entered the core area with professional tools to carry out emergency disposal and rescue at the scene.

 

 

Scientific disposal: after site investigation, the technicians determined that the flange gasket aging caused by leakage, arranged for two people to carry explosion-proof wrenches to tighten the sewage hole bolts, 9:55, the leakage point was successfully sealed, the environmental monitoring team confirmed that the gas concentration at the scene fell to a safe range, the drill task was successfully completed.

 

Save for a rainy day, safety knows no bounds

Company leader Geng Quanwu pointed out in the concluding comments, “The end of the drill does not mean the end of safety work, but a new starting point. For the communication equipment found in the drill is not enough range, multi-departmental coordination efficiency to be improved and other issues, the Department of Safety to be completed within a week to rectify, and to establish a ‘quarterly drill” long-term mechanism."

 

It is reported that the company will take this drill as an opportunity to continue to improve the “human + technical + physical defense” trinity security system, focusing on promoting intelligent transformation of storage tanks, retrofitting 24-hour leakage online monitoring and early warning system, and strive to compress the response time of 50%, to take practical action to protect the lives of employees and practice corporate social responsibility. Responsibility.

 

Safety is the best benefit, peace is the greatest happiness. The company will be “always at ease” sense of responsibility, build a solid production safety line of defense, for high-quality development escort!

Cart (0 items)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare